|
The NUROL GROUP was founded in Ankara,
Turkey in the 60’s, and began its
development in the construction sector.
Long-term programs with innovative
technologies, company organisation and
performance, both in construction and
trading fields, have advanced the GROUP plan
structured growth both nation-wide and
internationally.
The NUROL GROUP comprises of
thirty-nine operating companies diversified
into seven major areas of activity:
Construction, Trading, Tourism and Hotel
Management, Finance and Insurance, Machinery
and Defence Industry, Food and Electronics.
NUROL CONSTRUCTION AND TRADING CO. INC.
(“NUROL”), which is the nucleus company
of the NUROL GROUP, was established
in 1966, as a general international
contracting company, and since that time the
Company pursued large scale, hi-tech
transnational projects.
1980-1990 was a period of economic expansion
for Turkey. In line with the booming
national economy, NUROL extended its
activities into oil producing countries
particularly The Kingdom of Saudi Arabia and
engaged in various “Turnkey” projects on
Engineering-Procurement-Construction basis.
By the end of this decade NUROL was
ranked among the top ten international
general contractors of Turkey. The most
significant developments of this period
include the Yanbu Industrial City
Residential Facilities, Makkah City Water
Supply and Sewerage Network and Riyadh City
Sewerage System Construction Projects in The
Kingdom of Saudi Arabia, Ayaş Tunnel
Construction Project, Turkish F16 Aircraft
Manufacturing Facilities Construction and
Kürtün Dam and Hydroelectric Power Plant
Projects in Turkey.
Since 1990, having a leading position in
Turkey, NUROL’s international
activities are focused particularly in the
Russian Federation and the other
Commonwealth of Independent States (CIS)
countries through its affiliate company
named MENSEL. In 1991, just a year after the
fall of the Soviet Union, we were assigned
our first contract in Turkmenistan and we
were one of the first western companies to
provide contracting services in the CIS.
With its technological and management
back-up and its leading position in
construction sector with more than 7000
technical and administrative personnel and
labour, equipment park valued at over 100
million US Dollar, and having the capacity
and capability of providing finance, the
Company established effective strengths and
increased its commitments to high-technology
projects with the most prestigious
Governmental Clients of Turkey and esteemed
organisations all around the world.
Having been completed the major housing
projects such as Beylikdüzü Mass Housing
Project with 875 housing units, Bosphorus
Tarabya Houses with 217 luxurious type
houses and Bahçeşehir Satellite Town Project
of 5 million m2 project area and with 2,700
apartments in high-rise buildings and 550
villas, all constructed by NUROL together
with all infrastructure works and public
buildings, Nurol Residence with
high-luxurious type houses, forming the
crest level of housing sector in Turkey,
and; corporate building projects such as
Maslak Business Center with a closed area
of 60,000 m2, Oasis Commercial Center with
a project area of 50,000 m2 locally and
Ashgabad National Manuscripts Institute in
Turkmenistan, Nefteyugansk Airport Terminal
Building in Russia and finally the Serahs
Railway Terminal Building at the
Iran-Turkmenistan Border, NUROL’s
achievements were progressed with increased
growth trend in the beginning of the 21st
Century as well.
The accomplishments have been also
progressed in the first decade of 21st
Century. Kürtün Dam and Hydroelectric Power
Plant (the first concrete faced rock-fill
type dam in Turkey), which began power
production and taken over in September 2003
and the 570 million US Dollar valued 150
km long Toprakkale-İskenderun Motorway
Project which is a part of the
Trans-European Motorway in Turkey (realized
through the foreign loans supplied by
NUROL), Sheraton Apart Hotel, Congress
and Cultural Center (the facilities have a
closed area of 36,000 m2 and a congress
center with one of the highest capacities
for its type not only in the region but in
Europe) forming the complimentary facilities
to existing NUROL GROUP member
Sheraton Ankara Convention Center are all
major projects added to references in this
period. Furthermore, NUROL’s
remarkable on-going achievements in Turkey
are 350 million US Dollar Bolaman-Perşembe
Section of Black Sea Coastal Dual Base
Highway Project, 270 million US Dollar
valued, 95 km long Kemerhisar-Eminlik
section of the Ankara-Pozantı Motorway
Project, (which forms the main section of
the Trans-European Motorway in Anatolia) and
both motorways are realized through the
foreign loans supplied by the Contractor
Groups.
First stage (formed of 500 units) of MN
Bahçeşehir Houses Project, comprised of 1500
luxurious residences, is in progress as of
March 2006 and scheduled to be completed in
2007.
As
a result of large-scaled business
development works executed, in summer 2003,
Afghanistan is added to NUROL’s
activity range through three projects one of
them being the 80 km section of Kabul-Kandahar
Highway under the Contract signed with the
Louis Berger Group Inc. (USA). Moreover,
activities in Poland have been brought to
project realization stage by finalizing the
establishment activities of GROUP’s
investment company, namely Europower Centrum
Ltd. and as the first step, land development
activities for warehouse complex with 90,000
m2 closed area with housing/corporate
building facilities over a project area of
110 hectares is currently in progress.
As of May 2004, the international group
where NUROL is one of the local
partners, have been awarded the Bosphorus
Tube Tunnel Crossing for metro under the sea
in Istanbul/Turkey. The tunnel for which the
project realization has started, is
approximately 13.5 km long with 1.8 km
section of under sea crossing constructed by
immersed tube tunneling technology.
In addition to the mentioned achievements,
the Middle East and North Africa regions are
held as a focus of project development
activities through the regional directorates
in Algiers/Algeria, Abu Dhabi/UAE and Iraq.
As of July 2006 activities in Algeria are
progressing through Dourera Dam and
Facilities Project whereas the activities in
Gulf area are progressing through Nakheel
International City, Residential/Commercial
Buildings Packages 9 and 12 in Dubai/UAE,
Connection Bridge Project between Abu Al
Shouum and Abu Dhabi, Khalidiya Palace
Rotana Hotel and Residences projects in Abu
Dhabi/UAE and Jumeirah Village North,
Construction, Completion and Maintenance of
Infrastructure Works in Dubai/UAE.
Project development works in Turkey are also
being progressed. Ilısu Dam and HEPP Project
having the second highest body volume in
Turkey with its body volume of 45 million
m3 and having a power plant of 1,200 MW is
decided to be awarded to the JV where
NUROL is participant. The project
foresighted to be having a value around 1.35
billion USD, is planned to reach realization
stage as of 2006.
NUROL’s greatest strengths lie in its
infrastructure business of civil and
manufacturing engineering, while its
multidisciplinary skills enable it to be at
the forefront of the engineering,
construction and maintenance of major
infrastructure projects around the world and
hence the Company main fields of activity
are as follows:
v
Infrastructure Projects:
Ø
motorways and highways
Ø
railway and metro systems
Ø
tunnels
Ø
gas and oil pipelines and auxiliary
facilities
Ø
thermal power plants
Ø
irrigation and drainage systems
Ø
dams and hydroelectric power plants
Ø
water supply and sewerage systems
Ø
domestic and industrial type treatment
plants
v
Turnkey Manufacturing Facilities and
Industrial Plant Projects
v Luxurious Housing, Mass Housing and Social
Centre Projects
v
Industrial District Sites and Business
Centre Projects
v Hotel and Resort Projects
A reorganization and quality system
improvement process has been accomplished in
the beginning of year 2001 and the Quality
Management System has been certified for
ISO 9001 Quality Standard by Bureau
Veritas Quality International (BVQI) with
the scope title “Development, Design and
Implementation of General Construction
Works”. After the upgrade of the certificate
to ISO 9001:2000 Standard in 2003, in
parallel to the re-organizing works of the
quality system into integrated managerial
systems, audits were carried out by NIS
Zertfizierungs und Umweltgutachter GmbH (NISZERT)
for ISO
9001:2000, ISO 14001:2004 and OHSAS
18001:1999 in March 2004. The scope of
the system and the certificate(s) include
all activities carried over the Company such
as the Head Office, Construction Sites,
Branch Offices and Support Activities.
NUROL CONSTRUCTION AND TRADING CO. INC.
has the power to execute all kinds of
contracting works from feasibility studies
to turnkey industrial plant projects
requiring high technology with an ultimate
level of success. The company’s history full
of successfully completed projects together
with its name that became the symbol of
leadership and reliability is the strongest
indication that NUROL will continue
its growth trend and participating in major
projects with the same speed in the 21st
Century.
|